Floating tasks not at the top


  • Please log in to reply
No replies to this topic

#1 rwade55

rwade55

    Newbie

  • Members
  • Pip
  • 3 posts

Posted 22 August 2013 - 08:37 AM

I checked the box to move floating tasks to the top, but they didn't. They seem to follow their priority. Right now in the Today view my priorities from the top down are high, normal, top, high. In the top high section are two floating tasks at the top. Then there are four dated tasks. Under that are two dated tasks under "normal". Then there is a section labeled "top" with three floating tasks. Then there is another section labeled "high" with one floating task. Why would there be two "high" sections? And why aren't the floating tasks all at the top?